Energy-saving renovation scenario:
Data center inter-column air conditioning: Replace AC centrifugal fans with EC centrifugal fans of the same specifications, and the annual electricity cost savings for each fan usually cover the replacement cost within 1.5-2.5 years.
Commercial fresh air unit (AHU/PAU):
EC centrifugal fan reduces the frequency converter link, improves system efficiency, and meets the requirements of on-demand ventilation (DCV) control.
Green building and regulatory compliance:
Compliant with the minimum energy efficiency requirements of the EU ErP 2015 Directive (EU 327/2011) for fans - AC centrifugal fans will no longer meet the energy efficiency threshold for newly installed equipment after 2023.
Directly support the rating of LEED Energy and Atmosphere (EA) and BREEAM Energy categories.
Meet the mandatory energy efficiency compliance requirements for new construction and renovation projects in the European and American markets.